Johor Signal.my
Updated 7 Nov 2026
F/Sector·Digital economy
Ongoing

Ibrahim Technopolis (IBTEC) and Sedenak Tech Park

Lead / parties
JLand Group (Johor Corporation)
Reported value
RM27 billion GDV
Flagship zone
Kulai – Sedenak
Status
Ongoing · 6 of 9 milestones reached

A 7,290-acre technology township in Sedenak, Kulai, developed over about 22 years and anchored by the Sedenak Tech Park data centre cluster. It targets advanced E&E, medical technology, life sciences and logistics, with shared facilities meant to pull local SMEs into those supply chains.

06/09 milestones

Timeline

  1. Zaha Hadid Architects appointed for the 582-acre Discovery City
  2. IBTEC launched; Sedenak Tech Park reports RM34.5 billion in committed data centre investment
  3. RM30 billion FDI secured for StepEast phase 1, powered by a 275kV substation of up to 800MW
  4. JLand and DHL Supply Chain sign MoU to study build-to-rent logistics facilities
  5. YTL Power and JLand announce a gigawatt-scale data centre campus at STeP West
  6. Falcon Data Centre at Sedenak Tech Park completed by DDSP, Keppel Data Centres and China Huashi
  7. 2026TNB 500kV substation at STeP West completed
  8. Date not setTiong Nam 300-acre logistics hub developed
  9. Date not setNew bypass road from the Sedenak toll built

Sources

  1. The Edge — JLand launches IBTEC (Dec 2025)
  2. The Edge — IBTEC utilities, substations and logistics hub (Dec 2025)
  3. Malay Mail — RM30b FDI for StepEast (Dec 2025)
  4. Future Southeast Asia — Zaha Hadid Discovery City (Aug 2024)
  5. Dagang News — JLand and DHL logistics MoU (Jul 2026)
  6. The Star — YTL Power and JLand data centre campus (Aug 2026)
  7. The Independent SG — Falcon Data Centre completed (Oct 2026)

Last checked 7 Nov 2026. Johor Signal is an independent tracker; every milestone links to a public report. Spot an update? Email g.w.e.wee@soton.ac.uk.